ISO 22301

Utility Failure Response Procedure

Professional, ready-to-use QEHS document designed to support effective implementation, documentation, and ongoing compliance with applicable management system requirements.

Fully Customizable Audit Ready Instant Download
Standard
ISO 22301
Document Type
Procedure
Format
DOCX
Language
English
Tags
BCMS, ISO 22301, Procedure

This procedure sets out how your organisation prepares for, responds to and recovers from the failure or disruption of utilities — electricity, water, gas, heating, ventilation and air conditioning (HVAC), telecommunications and internet, and fuel — so that people are kept safe, damage is limited, and prioritized activities continue within their recovery time objectives (RTOs).

What's Inside

  • Identify Utility Dependencies and Risks
  • Utility Resilience Arrangements
  • Detection and Alerting
  • Response Levels
  • General Response Steps
  • Utility-Specific Actions
  • Extended Outages

ISO 22301 Alignment

Supports ISO 22301:2019 requirements, including Clauses 8.4.4 and 8.4.5. It fits with the rest of the QEHS Vault ISO 22301 document set.

Format

Supplied as a fully editable Microsoft Word (.docx) file. Add your organisation’s name, logo and details, then use it straight away. Instant download after purchase.

Key Benefits

  • Professional, ready-to-use QEHS document designed to support effective implementation, documentation, and ongoing compliance with applicable management system requirements